Se Connecter/S’inscrire
Votre courriel a été envoyé.
745 US Highway 52 - Former J.M Stuart Power Plant Lot • Terrain industriel • 402 Acres • Manchester, OH 45144



Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS DE L'INVESTISSEMENT
- Power substation, river with permitted dock, unlimited water, and power generation capabilities.
RÉSUMÉ DE L'ANNONCE
Former Power Plant site that is available for redevelopment for a renewable energy site or industrial/manufacturing site. The property boasts robust infrastructure and high capacity public utilities. Data centers including hyper-scalers would benefit from the access to water, power substation on site, and other benefits of the site. There is no county zoning in Adams County thus zoning compliance would be met with County Official approvals.
Potential for 650 MW of power to be produced on site within 24 months. The new FERC requirements can be met without issues per power plan in place for this property.
Potential for 650 MW of power to be produced on site within 24 months. The new FERC requirements can be met without issues per power plan in place for this property.
FAITS SUR LA PROPRIÉTÉ
| Type de vente | Investissement | Sous-type de propriété | Terrain industriel |
| Nombre de lots | 1 | Utilisation proposée | |
| Type de propriété | Terrain | Taille totale du lot | 402,00 AC |
| Zonage | I - Industrielles | ||
| Type de vente | Investissement |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain industriel |
| Utilisation proposée | |
| Taille totale du lot | 402,00 AC |
| Zonage | I - Industrielles |
1 LOT DISPONIBLE
Lot
| Taille du lot | 402,00 AC |
| Taille du lot | 402,00 AC |
Located at 745 US 52 Manchester, OH, this former power plant property spans 445 +/- acres with an additional 999 +/- acres available upon completion of remediation.
DESCRIPTION
Expandable site situated within 50 minutes east of Cincinnati. Former power plant site with substation situated on the site. Sellers have the ability to generate power up to 650 MW behind the meter within 24 months to move your project forward sooner rather than later.
1 de 16
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D MATTERPORT
PHOTOS
VUE DEPUIS LA RUE
RUE
CARTE
Présenté par
745 US Highway 52 - Former J.M Stuart Power Plant
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.

