Se Connecter/S’inscrire
Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
Résumé de l'annonce
Land | 130.1 acres
Marketing description
Global Common LLC is developing a 300 MW data center campus on a 130-acre industrial site in Cromwell, with expansion potential exceeding 500 MW. The project benefits from direct access to three interstate natural gas pipelines via Enbridge, enabling on-site fuel cell generation with redundant, firm gas supply.
The development is positioned as an anchor energy user, with long-term gas transportation agreements underway. High-efficiency fuel cells, heat recovery systems, and the Northeast climate contribute to lower operating costs compared to southeastern U.S. markets. The site also offers strong fiber connectivity between New York City and Boston, supporting hyperscale and enterprise tenants. Projected COD is Q2 2028, with strong municipal support already secured.
Features
130-acre industrially zoned parcel BP Zone
Master-planned campus layout completed
Projected COD: Q2 2028
Equipment lead time secured (~15 months for fuel cells)
Strong local government backing
Seeking qualified tenants and equity partners
Positioned as an “Anchor Shipper” for firm gas transport
Tom Simjian
Keller Williams Realty
Tsimjian@kw.com
203-506-0388
Marketing description
Global Common LLC is developing a 300 MW data center campus on a 130-acre industrial site in Cromwell, with expansion potential exceeding 500 MW. The project benefits from direct access to three interstate natural gas pipelines via Enbridge, enabling on-site fuel cell generation with redundant, firm gas supply.
The development is positioned as an anchor energy user, with long-term gas transportation agreements underway. High-efficiency fuel cells, heat recovery systems, and the Northeast climate contribute to lower operating costs compared to southeastern U.S. markets. The site also offers strong fiber connectivity between New York City and Boston, supporting hyperscale and enterprise tenants. Projected COD is Q2 2028, with strong municipal support already secured.
Features
130-acre industrially zoned parcel BP Zone
Master-planned campus layout completed
Projected COD: Q2 2028
Equipment lead time secured (~15 months for fuel cells)
Strong local government backing
Seeking qualified tenants and equity partners
Positioned as an “Anchor Shipper” for firm gas transport
Tom Simjian
Keller Williams Realty
Tsimjian@kw.com
203-506-0388
Faits sur la propriété
| Type de vente | Propriétaire utilisateur | Sous-type de propriété | Terrain commercial |
| Nombre de lots | 1 | Utilisation proposée | |
| Type de propriété | Terrain | Taille totale du lot | 130,00 AC |
| Zonage | BP | ||
| Type de vente | Propriétaire utilisateur |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain commercial |
| Utilisation proposée | |
| Taille totale du lot | 130,00 AC |
| Zonage | BP |
1 Lot disponible
Lot
| Taille du lot | 130,00 AC |
| Taille du lot | 130,00 AC |
Land | 130.1 ACRES
1 1
Plutôt praticable à pied
30/100
Exceptionnellement facile d’accès en voiture
100/100
Plutôt praticable en vélo
50/100
1 de 8
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
1 de 1
Présenté par
76 Geer st - Geer St Cromwell 130 Acres
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.



