Partager cette annonce

Message

954 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Contactez le courtier pour plus d'informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Faits saillants de la sous-location

  • LEED-certified Class B office space available for sublease in an established business park.
  • Convenient access to BWI Airport and major transportation hubs including I-695, I-95, and MD-295.
  • Proximity to Baltimore and Washington D.C., offering regional connectivity and a robust employment base.
  • Total premises of approximately 29,715 square feet, configurable for office or warehouse delivery.
  • Attractive sublease terms with negotiable rates and substantial rent abatement period.
  • Building positioned in a well-maintained, professionally managed corporate setting.

Caractéristiques

Hauteur libre
16’
Baies d’entrée
8
Portes de quai de chargement extérieures
9
Places de stationnement standard
193

Tous les espaces disponibles(1)

Afficher les taux de location en

  • Espace
  • Taille
  • Terme
  • Taux de location
  • Utilisation de l’espace
  • Aménagement
  • Disponible
  • 1er étage - H-K
  • 29 715 pi²
  • Août 2033
  • Sur demande Sur demande Sur demande Sur demande
  • Flex
  • construction complète
  • 30 jours

811 Pinnacle Drive presents a Class B, LEED-certified office sublease opportunity within an established business park in Linthicum Heights, MD. This 29,715-square-foot space offers a conditioned environment and can be delivered in warehouse condition to accommodate varying operational needs. The property provides functional efficiency suited for office users seeking flexibility and adaptability. The site boasts a prime position near Baltimore/Washington International Airport (BWI), ensuring fast access for regional and national connectivity. Tenants benefit from proximity to major transportation routes such as I-695 Beltway, I-95, and MD-295, offering seamless travel to downtown Baltimore, Washington D.C., and surrounding suburban markets. The business park setting contributes to a professional and collaborative environment, fostering synergies among neighboring firms. With a sublease term expiring in August 2033, occupiers can take advantage of favorable lease conditions, negotiable rental rates, and a generous rent abatement period ranging from 12 to 18 months. The building’s LEED certification underscores its commitment to sustainability and operational efficiency, providing long-term cost benefits to tenants.

  • Espace de sous-location disponible auprès du locataire actuel
Espace Taille Terme Taux de location Utilisation de l’espace Aménagement Disponible
1er étage - H-K 29 715 pi² Août 2033 Sur demande Sur demande Sur demande Sur demande Flex construction complète 30 jours

1er étage - H-K

Taille
29 715 pi²
Terme
Août 2033
Taux de location
Sur demande Sur demande Sur demande Sur demande
Utilisation de l’espace
Flex
Aménagement
construction complète
Disponible
30 jours

1er étage - H-K

Taille 29 715 pi²
Terme Août 2033
Taux de location Sur demande
Utilisation de l’espace Flex
Aménagement construction complète
Disponible 30 jours

811 Pinnacle Drive presents a Class B, LEED-certified office sublease opportunity within an established business park in Linthicum Heights, MD. This 29,715-square-foot space offers a conditioned environment and can be delivered in warehouse condition to accommodate varying operational needs. The property provides functional efficiency suited for office users seeking flexibility and adaptability. The site boasts a prime position near Baltimore/Washington International Airport (BWI), ensuring fast access for regional and national connectivity. Tenants benefit from proximity to major transportation routes such as I-695 Beltway, I-95, and MD-295, offering seamless travel to downtown Baltimore, Washington D.C., and surrounding suburban markets. The business park setting contributes to a professional and collaborative environment, fostering synergies among neighboring firms. With a sublease term expiring in August 2033, occupiers can take advantage of favorable lease conditions, negotiable rental rates, and a generous rent abatement period ranging from 12 to 18 months. The building’s LEED certification underscores its commitment to sustainability and operational efficiency, providing long-term cost benefits to tenants.

  • Espace de sous-location disponible auprès du locataire actuel

Faits sur la propriété

Taille du bâtiment
48 120 pi²
Taille du lot
6,05 AC
Année de construction
2017
Durabilité
Certifié LEED or
Construction
Maçonnerie
Zonage
W-1

Sélectionner des locataires

  • Étage
  • Nom du locataire
  • Secteur
  • 1ᵉʳ
  • EN Engineering
  • Services professionnels, scientifiques et techniques
  • 1ᵉʳ
  • Print-O-Stat
  • Fabrication
  • 1ᵉʳ
  • Sterling Engineering Inc
  • Services professionnels, scientifiques et techniques
  • 1ᵉʳ
  • TAI Engineering
  • -
Relativement accessible à pied
30/100
Exceptionnellement adapté aux voitures
100/100
Transports en commun limités
30/100
Relativement accessible en vélo
20/100
  • ID d’inscription: 41267695

  • Date de mise sur le marché: 2026-07-13

  • Dernière mise à jour:

  • Adresse: 811 Pinnacle Dr, Linthicum Heights, MD 21090

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}