Se Connecter/S’inscrire
Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS DE L'INVESTISSEMENT
- 4MW of Electrical Service
- Rail Service
- Chemical Bulk Storage
RÉSUMÉ DE L'ANNONCE
Built in 1995 with an expansion in 2009, the facility is strategically located just minutes from US Highway 311, which connects Danville, VA to Winston-Salem, NC and links to US Highway 220, a key north-south corridor through central North Carolina.
The property is equipped with numerous specialized and hard-to-replace infrastructure features, including 4MW of electrical service, steam boilers, water chillers, compressed air systems, chemical bulk storage and rail service. These built-in capabilities make the facility ideally suited for intensive manufacturing operations. With it scale, infrastructure, and strategic location, this property represents a rare and valuable industrial opportunity in the southeastern United States.
The property is equipped with numerous specialized and hard-to-replace infrastructure features, including 4MW of electrical service, steam boilers, water chillers, compressed air systems, chemical bulk storage and rail service. These built-in capabilities make the facility ideally suited for intensive manufacturing operations. With it scale, infrastructure, and strategic location, this property represents a rare and valuable industrial opportunity in the southeastern United States.
TAXES ET DÉPENSES D’EXPLOITATION (RÉEL - 2025) Cliquez ici pour accéder à |
ANNUEL (CAD) | ANNUEL PAR pi² (CAD) |
|---|---|---|
| Taxes |
-
|
-
|
| Dépenses d’exploitation |
-
|
-
|
| Total des dépenses |
$99,999
|
$9.99
|
TAXES ET DÉPENSES D’EXPLOITATION (RÉEL - 2025) Cliquez ici pour accéder à
| Taxes (CAD) | |
|---|---|
| Annuel | - |
| Annuel par pi² | - |
| Dépenses d’exploitation (CAD) | |
|---|---|
| Annuel | - |
| Annuel par pi² | - |
| Total des dépenses (CAD) | |
|---|---|
| Annuel | $99,999 |
| Annuel par pi² | $9.99 |
FAITS SUR LA PROPRIÉTÉ
COMMODITÉS
- Terrain clôturé
- Système de sécurité
SERVICES PUBLICS
- Éclairage
- Gaz
- Eau - Ville
- Égout - Ville
- Chauffage
1 1
Impôts fonciers
| Numéro de lot | 110534 | Évaluation des bâtiments | 18 999 494 $ CAD |
| Évaluation du terrain | 705 433 $ CAD | Évaluation totale | 19 704 927 $ CAD |
Impôts fonciers
Numéro de lot
110534
Évaluation du terrain
705 433 $ CAD
Évaluation des bâtiments
18 999 494 $ CAD
Évaluation totale
19 704 927 $ CAD
1 de 17
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D MATTERPORT
PHOTOS
VUE DEPUIS LA RUE
RUE
CARTE
1 de 1
Présenté par
816 W Fieldcrest Rd
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.



