Votre courriel a été envoyé.
88-90 Micklegate - Ultra-Rapid E.On EV Charging Hub Investment Unité de condo • Commerce de détail • 3 493 pi² • À vendre 2 409 719 $ CAD • York YO1 6JX



Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Let to E.ON Drive Infrastructure (UK) Ltd (20 years, no breaks)
- Net Initial Yield of 6.82%
- Eight-bay hub with 400kW ultra-rapid charging units
- £94,000 per annum with CPI-linked uplifts (1% collar / 3% cap)
- First ultra-rapid EV charging hub in York
- Strong surrounding occupiers including Aviva, Travelodge and Radisson
Résumé de l'annonce
The property comprises a modern EV charging hub investment located within the Micklegate quarter of York city centre, one of the city’s principal commercial and leisure destinations. The site extends to approximately 0.08 acres (3,493 sq ft) and provides a purpose-built ultra-rapid electric vehicle charging facility, comprising an eight-bay hub served by four 400kW charging units, together with associated infrastructure. The property is let in its entirety to E.ON Drive Infrastructure (UK) Ltd on a 20-year lease (without break), producing a passing rent of £94,000 per annum, subject to CPI-linked rent reviews (1% collar / 3% cap). The asset occupies a prominent and accessible position within York city centre, with nearby occupiers including Aviva, Travelodge, Radisson and Malmaison, and benefits from strong vehicular movement and connectivity. The property represents the first and only ultra-rapid EV charging hub within the city. In addition, the site offers potential for alternative use or redevelopment, subject to planning, with previous consent secured for a seven-storey micro hotel scheme.
1 Unité disponible
Unité Whole
| Taille de l’unité | 3 493 pi² | Utilisation du condo | Commerce de détail |
| Prix | 2 409 719 $ CAD | Type de vente | Investissement |
| Prix par pi² | 689,87 $ CAD | Ancienneté | Pleine propriété |
| Taille de l’unité | 3 493 pi² |
| Prix | 2 409 719 $ CAD |
| Prix par pi² | 689,87 $ CAD |
| Utilisation du condo | Commerce de détail |
| Type de vente | Investissement |
| Ancienneté | Pleine propriété |
Faits sur la propriété
| Taille totale du bâtiment | 3 493 pi² | Superficie de plancher typique | 3 493 pi² |
| Type de propriété | Spécialité (Condo) | Année de construction | 2026 |
| Planchers | 1 | Taille du lot | 0,08 AC |
| Taille totale du bâtiment | 3 493 pi² |
| Type de propriété | Spécialité (Condo) |
| Planchers | 1 |
| Superficie de plancher typique | 3 493 pi² |
| Année de construction | 2026 |
| Taille du lot | 0,08 AC |
Présenté par
88-90 Micklegate - Ultra-Rapid E.On EV Charging Hub Investment
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
