Votre courriel a été envoyé.
9 Central Way 2 446–25 860 pi² d'espace disponible • Industriel • Londres NW10 7XQ



Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS
- À distance de marche de la station UG Harlesden (ligne Bakerloo)
- Commodités à proximité
- Proximité de l'A40 et de l'A406
CARACTÉRISTIQUES
TOUS LES ESPACES DISPONIBLES(2)
Afficher les taux de location en
- ESPACE
- TAILLE
- TERME
- TAUX DE LOCATION
- UTILISATION DE L’ESPACE
- ÉTAT
- DISPONIBLE
The unit comprises a modern, detached logistics/distribution facility prominently positioned on the corner of Central Way. The unit is of steel portal frame construction, situated on a large self-contained fenced and gated site which incorporates benefiting from a large secure loading yard with ample allocated parking provisions. Access to the open-plan warehouse area is available via two deep loading bays, ample HGV tracking and idling space along with designated parking area and landscaping. Two level access loading doors benefiting from a covered loading canopy, lead to the open plan warehouse area which allows for a clear eaves height of 6m. Ancillary office accommodation is arranged over two floors to the front elevation of the building. The unit is to be comprehensibly refurbished.
- Classe d’utilisation : B2
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 25 860 pi² d’espace adjacent.
- Canopée de chargement couverte
- Panneaux de toit translucides
- Comprend 1 485 pi² d’espace de bureau dédié
- À être entièrement remis à neuf
- Alimentation triphasée
The unit comprises a modern, detached logistics/distribution facility prominently positioned on the corner of Central Way. The unit is of steel portal frame construction, situated on a large self-contained fenced and gated site which incorporates benefiting from a large secure loading yard with ample allocated parking provisions. Access to the open-plan warehouse area is available via two deep loading bays, ample HGV tracking and idling space along with designated parking area and landscaping. Two level access loading doors benefiting from a covered loading canopy, lead to the open plan warehouse area which allows for a clear eaves height of 6m. Ancillary office accommodation is arranged over two floors to the front elevation of the building. The unit is to be comprehensibly refurbished.
- Classe d’utilisation : B2
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 25 860 pi² d’espace adjacent.
- Canopée de chargement couverte
- Panneaux de toit translucides
- Comprend 1 695 pi² d’espace de bureau dédié
- À être entièrement remis à neuf
- Alimentation triphasée
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| RDC | 23 414 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction partielle | Maintenant |
| 1er étage | 2 446 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction partielle | Maintenant |
RDC
| Taille |
| 23 414 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| construction partielle |
| Disponible |
| Maintenant |
1er étage
| Taille |
| 2 446 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| construction partielle |
| Disponible |
| Maintenant |
RDC
| Taille | 23 414 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | construction partielle |
| Disponible | Maintenant |
The unit comprises a modern, detached logistics/distribution facility prominently positioned on the corner of Central Way. The unit is of steel portal frame construction, situated on a large self-contained fenced and gated site which incorporates benefiting from a large secure loading yard with ample allocated parking provisions. Access to the open-plan warehouse area is available via two deep loading bays, ample HGV tracking and idling space along with designated parking area and landscaping. Two level access loading doors benefiting from a covered loading canopy, lead to the open plan warehouse area which allows for a clear eaves height of 6m. Ancillary office accommodation is arranged over two floors to the front elevation of the building. The unit is to be comprehensibly refurbished.
- Classe d’utilisation : B2
- Comprend 1 485 pi² d’espace de bureau dédié
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 25 860 pi² d’espace adjacent.
- À être entièrement remis à neuf
- Canopée de chargement couverte
- Alimentation triphasée
- Panneaux de toit translucides
1er étage
| Taille | 2 446 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | construction partielle |
| Disponible | Maintenant |
The unit comprises a modern, detached logistics/distribution facility prominently positioned on the corner of Central Way. The unit is of steel portal frame construction, situated on a large self-contained fenced and gated site which incorporates benefiting from a large secure loading yard with ample allocated parking provisions. Access to the open-plan warehouse area is available via two deep loading bays, ample HGV tracking and idling space along with designated parking area and landscaping. Two level access loading doors benefiting from a covered loading canopy, lead to the open plan warehouse area which allows for a clear eaves height of 6m. Ancillary office accommodation is arranged over two floors to the front elevation of the building. The unit is to be comprehensibly refurbished.
- Classe d’utilisation : B2
- Comprend 1 695 pi² d’espace de bureau dédié
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 25 860 pi² d’espace adjacent.
- À être entièrement remis à neuf
- Canopée de chargement couverte
- Alimentation triphasée
- Panneaux de toit translucides
APERÇU DE LA PROPRIÉTÉ
Située sur Central Way, au cœur du secteur industriel de premier plan de Park Royal, l'unité est située dans une position bien en vue avec un accès facile à l'A40 Western Ave et à l'A406 North Circular Road, qui mènent à leur tour aux M40, M25, M4 à l'ouest et M1 au nord. Les liaisons de transport en commun sont également solides avec de multiples lignes d'autobus et de train qui traversent le quartier industriel.
FAITS SUR L’INSTALLATION ENTREPÔT
Présenté par
Entreprise non fournie
9 Central Way
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
