Partager cette annonce

Message

910 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Contactez le courtier pour plus d'informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Faits saillants de l'investissement

  • Excellent Utility-Scale BESS site next to SCE substation, short gen-tie
  • Scalable merchant BESS and/or C-16 candidate
  • Previously disturbed level site, straight-forward County permitting pathway

Résumé de l'annonce

Advanced-stage 9.7-acre utility-scale Battery Energy Storage System (BESS) development site directly adjoining Southern California Edison’s Phelan Substation in San Bernardino County, California. The property offers immediate proximity to multiple SCE voltage classes, including 12-kV, 33-kV, and 115-kV infrastructure interconnected toward the Victor Valley / High Desert reliability corridor. County pre-application review completed with no General Plan Amendment or rezoning identified. Biological, cultural, and Phase I environmental investigations completed with no significant findings, substantially reducing early-stage CEQA uncertainty. The flat, commercially zoned parcel may support standalone utility-scale BESS development in the 200–400+ MWh range, subject to interconnection and permitting review. Interconnection analysis and entitlement materials available during due diligence period.
Properties highly suitable for battery energy storage system (BESS) development are relatively scarce and currently in demand by experienced energy storage developers. Pricing is based on the strategic infrastructure value of the site for utility-scale BESS development rather than conventional vacant land comparables. Key valuation factors include grid position, utility adjacency, permitting feasibility, and the absence of major environmental constraints.
Utility-scale BESS land economics differ materially from conventional vacant land valuation metrics. Depending on project size, qualified California BESS sites may support long-term lease structures with multi-million-dollar aggregate values over the operating life of the project. As a result, strategic grid-adjacent properties are often valued based on infrastructure development potential rather than traditional land comparables.

Faits sur la propriété

Prix 1 339 348 $ CAD
Type de vente Investissement ou propriétaire utilisateur
Nombre de lots 1
Type de propriété Terrain
Sous-type de propriété Terrain commercial
Utilisation proposée Industriel
Taille totale du lot 9,73 AC
Rues transversales Phelan Road
Zonage CS - Commercial Service - Zoning allows utility-scale BESS with County Use Permit approval, per County Pre-Application review of conceptual 400 MWh BESS site plan

1 Lot disponible

Lot

Prix 1 339 348 $ CAD
Prix par AC 137 651,39 $ CAD
Taille du lot 9,73 AC

Vacant 9.7-acre parcel adjoining SCE Phelan Substation, Phelan, CA. Utility-Scale BESS development site. 12-kV, 33-kV, 115-kV circuits.

Description

Vacant 9.7-acre parcel directly adjoining Southern California Edison’s Phelan Substation in San Bernardino County, California. Advanced-stage utility-scale Battery Energy Storage System (BESS) development opportunity with potential access to SCE 115-kV infrastructure serving the Victor Valley / High Desert reliability corridor. ________________________________________ Phelan Substation Utility-Scale Battery Energy Storage Development Opportunity Location: Adjacent to Southern California Edison’s Phelan Substation Utility: Southern California Edison (SCE) Jurisdiction: San Bernardino County, California Parcel Size: Approximately 9.7 acres Zoning: Service Commercial (CS) Entitlement Status: County pre-application review completed Use Potential: Utility-scale standalone BESS and related utility infrastructure subject to Conditional Use Permit approval ________________________________________ Why This Site Matters 115-kV High Desert Storage Platform The property directly adjoins the SCE Phelan Substation and offers immediate proximity to multiple voltage classes, including: • 12-kV distribution infrastructure • 33-kV subtransmission infrastructure • 115-kV transmission/subtransmission infrastructure The 115-kV system includes circuits interconnected toward SCE’s Victor Substation and broader Southern California reliability network, creating potential pathways for larger utility-scale storage development. Potential utility-scale RA opportunity The site may support medium- to utility-scale standalone battery storage configurations, including potential 4-hour Resource Adequacy (RA) applications subject to interconnection review. The parcel appears physically capable of supporting large-scale BESS deployment in the 200–400+ MWh range depending on final engineering, technology selection, setbacks, and interconnection configuration. Advanced-stage entitlement candidate Substantial early-stage permitting and environmental work has already been completed, materially reducing development uncertainty. Completed investigations include: • biological assessment with no sensitive biological resource findings • cultural resources assessment with no significant cultural findings • Phase I Environmental Site Assessment with no recognized environmental conditions San Bernardino County pre-application review confirmed that utility-scale BESS is an allowable use within the existing Commercial land use designation subject to CUP approval. No General Plan Amendment or rezoning identified. ________________________________________ Strategic High Desert Location The Phelan node remains relatively underbuilt compared with many California storage locations and functions as part of the broader Victor Valley / High Desert electrical system. The property offers: • direct substation adjacency • short potential gen-tie pathways • flat developable land • paved road access from Johnson Road • proximity to growing Southern California load-serving infrastructure Compared with many California energy development sites, the project benefits from a substantially narrowed anticipated CEQA scope focused primarily on: • visual analysis • operational noise • lighting • standard air quality and engineering studies • hazard management review ________________________________________ Interconnection / Development Considerations Based on preliminary interconnection review and SCE Cluster 15 findings: • reviewed 115-kV discharge scenarios did not identify major overload-related discharge constraints • charging constraints appear concentrated during summer daytime peak periods • significantly greater charging availability exists overnight and during early morning hours • overnight charging profiles may support larger 4-hour BESS systems than an initial surface-level review might suggest Potential development pathways may include: • utility-scale standalone BESS • Resource Adequacy-oriented storage • merchant storage • grid reliability / non-wires applications • future hybrid storage configurations ________________________________________ County Review Status San Bernardino County pre-application review completed. County review identified a focused permitting pathway centered primarily on: • visual impact analysis • operational noise analysis • hazard management / fire safety review • standard drainage and engineering review Estimated County review timeline: approximately 210–300 days depending on application completeness and technical studies. ________________________________________ Offering 9.7-acre substation-adjacent parcel offered for: • sale • long-term ground lease • or joint venture participation Preliminary interconnection analysis, County review documents, biological assessment, cultural resources assessment, and Phase I ESA materials available during due diligence period. Please note: Seller is engaging only with parties evaluating the opportunity at a transaction or active due diligence level, including pricing, structure, interconnection evaluation, or development review. Additional California substation-adjacent energy development opportunities available.

Relativement accessible à pied
30/100
Exceptionnellement adapté aux voitures
100/100
Transports en commun limités
20/100
Relativement accessible en vélo
20/100

Impôts fonciers

Impôts fonciers

Numéro de lot
3066-331-06
Évaluation du terrain
593 133 $ CAD
Évaluation des bâtiments
0 $ CAD
Évaluation totale
593 133 $ CAD
  • ID d’inscription: 40310175

  • Date de mise sur le marché: 2026-04-27

  • Dernière mise à jour:

  • Adresse: 9596 Johnson Rd, Phelan, CA 92371

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}