Se Connecter/S’inscrire
Votre courriel a été envoyé.
Graybar Electric 975 E Tallmadge Ave 39 204 pi² Industriel Immeuble Akron, OH 44310 2 351 763 $ CAD (59,99 $ CAD/pi²)



Certaines informations ont été traduites automatiquement.
RÉSUMÉ DE L'ANNONCE
• 39,204/SF warehouse/office building located on high traffic corridor in dense industrial park.
• Completely renovated in 2012 with incredible finishes in the office space, kitchen/breakroom, and restrooms.
• 3 Phase, 600A service to warehouse.
• 14’ overhead door on the north side, accessible by neighboring properties parking lot.
• One loading dock, and four overhead doors on the west side. One overhead door is being used as a dock the other two could be converted to docks if railing was removed.
• Chattel to stay upon request: cubicles, scissor lift, forklift, walk-behind floor scrubber, riding floor scrubber, walk-behind pallet lift and plenty of racking.
• Tenant will be completely out by the end of the year (2025).
• Completely renovated in 2012 with incredible finishes in the office space, kitchen/breakroom, and restrooms.
• 3 Phase, 600A service to warehouse.
• 14’ overhead door on the north side, accessible by neighboring properties parking lot.
• One loading dock, and four overhead doors on the west side. One overhead door is being used as a dock the other two could be converted to docks if railing was removed.
• Chattel to stay upon request: cubicles, scissor lift, forklift, walk-behind floor scrubber, riding floor scrubber, walk-behind pallet lift and plenty of racking.
• Tenant will be completely out by the end of the year (2025).
TAXES ET DÉPENSES D’EXPLOITATION (RÉEL - 2025) Cliquez ici pour accéder à |
ANNUEL (CAD) | ANNUEL PAR pi² (CAD) |
|---|---|---|
| Taxes |
-
|
-
|
| Dépenses d’exploitation |
-
|
-
|
| Total des dépenses |
$99,999
|
$9.99
|
TAXES ET DÉPENSES D’EXPLOITATION (RÉEL - 2025) Cliquez ici pour accéder à
| Taxes (CAD) | |
|---|---|
| Annuel | - |
| Annuel par pi² | - |
| Dépenses d’exploitation (CAD) | |
|---|---|
| Annuel | - |
| Annuel par pi² | - |
| Total des dépenses (CAD) | |
|---|---|
| Annuel | $99,999 |
| Annuel par pi² | $9.99 |
FAITS SUR LA PROPRIÉTÉ
1 1
Impôts fonciers
| Numéros de lot | Évaluation des bâtiments | 190 964 $ CAD | |
| Évaluation du terrain | 71 440 $ CAD | Évaluation totale | 262 404 $ CAD |
Impôts fonciers
Numéros de lot
Évaluation du terrain
71 440 $ CAD
Évaluation des bâtiments
190 964 $ CAD
Évaluation totale
262 404 $ CAD
1 de 20
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D MATTERPORT
PHOTOS
VUE DEPUIS LA RUE
RUE
CARTE
1 de 1
Présenté par
Graybar Electric | 975 E Tallmadge Ave
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
