Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS
- Newly Refurbished Office Accommodation.
- Suite Extends to 125.71 SQ.M / 1,353 SQ.FT.
- Last Remaining Suite Available.
- Private Car Parking.
TOUS LES ESPACES DISPONIBLES(1)
Afficher les taux de location en
- ESPACE
- TAILLE
- TERME
- TAUX DE LOCATION
- UTILISATION DE L’ESPACE
- ÉTAT
- DISPONIBLE
Dundee is Scotlands fourth largest city with an estimated population of population in the region of 515,000. The approximately 145,000 and a catchment retail and employment within the Tayside city is the regional centre for commerce, region and is located on the east coast of Scotland with 90% of the country's Dundee also has its own Airport providing population within a 90 minutes' drive time. daily scheduled flights to London. Dundee is currently undergoing a £1 billion transformation of its Waterfront, which comprises circa 240 Hectares of development land, a new state of the art Train Station and the V&A Museum of Design. More precisely, the subjects are located Innovation Parc within the established directly opposite the Michelin Scotland West Pitkerro Industrial Estate which road to both Aberdeen in the north and offers excellent links to the A90 trunk the central belt via Scotland's motorway network. There is direct access to the Dundee to Arbroath A92. West Pitkerro Industrial Estate is home to including DPD, Gillies and a Royal Mail a variety of national and local operators Distribution Centre. The ground floor of the building is currently occupied by Allied Health Care and HTS (Scotland) The subjects comprise a modern two frame construction overclad with panel storey detached office pavilion of steel sheets. There is one remaining suite on the first floor in tenant shell condition, ready for fit the east side of the building, with a shared out. The suite is accessed from the foyer of staircase to the remaining office suite. There are ample areas of private parking around the building.
- Classe d’utilisation : Class 4
- Disposition du plan d’étage ouverte
- Bureaux partitionnés
- Cuisine
- Plafond suspendu
- Suites de bureaux modernes à aire ouverte ou privées
- Concrétisement de haute spécification
- Entièrement construit comme Bureau standard
- Convient pour 4 à 11 personnes
- Espace en excellent état
- Complètement tapissé
- Installations WC abandonnées
- Parking privé
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| 1er étage, ste Northside | 1 353 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Bureau | construction complète | Maintenant |
1er étage, ste Northside
| Taille |
| 1 353 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Bureau |
| État |
| construction complète |
| Disponible |
| Maintenant |
1er étage, ste Northside
| Taille | 1 353 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Bureau |
| État | construction complète |
| Disponible | Maintenant |
Dundee is Scotlands fourth largest city with an estimated population of population in the region of 515,000. The approximately 145,000 and a catchment retail and employment within the Tayside city is the regional centre for commerce, region and is located on the east coast of Scotland with 90% of the country's Dundee also has its own Airport providing population within a 90 minutes' drive time. daily scheduled flights to London. Dundee is currently undergoing a £1 billion transformation of its Waterfront, which comprises circa 240 Hectares of development land, a new state of the art Train Station and the V&A Museum of Design. More precisely, the subjects are located Innovation Parc within the established directly opposite the Michelin Scotland West Pitkerro Industrial Estate which road to both Aberdeen in the north and offers excellent links to the A90 trunk the central belt via Scotland's motorway network. There is direct access to the Dundee to Arbroath A92. West Pitkerro Industrial Estate is home to including DPD, Gillies and a Royal Mail a variety of national and local operators Distribution Centre. The ground floor of the building is currently occupied by Allied Health Care and HTS (Scotland) The subjects comprise a modern two frame construction overclad with panel storey detached office pavilion of steel sheets. There is one remaining suite on the first floor in tenant shell condition, ready for fit the east side of the building, with a shared out. The suite is accessed from the foyer of staircase to the remaining office suite. There are ample areas of private parking around the building.
- Classe d’utilisation : Class 4
- Entièrement construit comme Bureau standard
- Disposition du plan d’étage ouverte
- Convient pour 4 à 11 personnes
- Bureaux partitionnés
- Espace en excellent état
- Cuisine
- Complètement tapissé
- Plafond suspendu
- Installations WC abandonnées
- Suites de bureaux modernes à aire ouverte ou privées
- Parking privé
- Concrétisement de haute spécification
APERÇU DE LA PROPRIÉTÉ
Les sujets sont situés directement en face du Michelin Scotland Innovation Parc, dans le domaine industriel West Pitkerro, qui offre d'excellents liens avec la route principale A90 vers Aberdeen au nord et la ceinture centrale via le réseau autoroutier de l'Écosse. Il y a un accès direct à la Dundee jusqu'à Arbroath A92. West Pitkerro Industrial Estate abrite une variété d'exploitants nationaux et locaux, dont DPP, Gillies et un centre de distribution du courrier royal. Le rez-de-chaussée de l'édifice est actuellement occupé par Allied Health Care et HTS (Écosse). L'emplacement approximatif est indiqué par le plan du système d'exploitation
- Système de sécurité
FAITS SUR LA PROPRIÉTÉ
Présenté par
Innovation House | Barlow Park
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.






