Partager cette annonce

Message

921 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Contactez le courtier pour plus d'informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Faits saillants de l'investissement

  • Strategic Location Near the Largest Nuclear Power Plant in America
  • Adjacent Fiber Infrastructure
  • Access to High-Voltage Transmission Infrastructure
  • Favorable Regulatory Environment

Résumé de l'annonce

The property is positioned within the shadow of the Vogtle Electric Generating Plant, the largest nuclear power facility in the United States, and benefits from proximity to high-voltage transmission infrastructure, regional fiber connectivity, and a pro-growth economic development environment actively pursuing large-scale technology investment.
Unlike the increasingly constrained Atlanta metropolitan market, Burke County offers developers the opportunity to establish large-scale digital infrastructure campuses in a jurisdiction that maintains a favorable entitlement environment, lower land acquisition costs, and access to significant state and local incentives.
The site's combination of scale, infrastructure proximity, and strategic location creates a rare opportunity for developers, hyperscalers, private equity investors, and infrastructure funds seeking a future-ready site capable of supporting significant power-intensive development.

Faits sur la propriété

Prix 22 999 414 $ CAD
Type de vente Investissement
Nombre de lots 1
Type de propriété Terrain
Sous-type de propriété Terrain commercial
Utilisation proposée Industriel
Taille totale du lot 226,44 AC

1 Lot disponible

Lot

Prix 22 999 414 $ CAD
Prix par AC 101 569,57 $ CAD
Taille du lot 226,44 AC

Coldwell Banker Commercial Metro Brokers is pleased to present an exceptional 226.44-acre development opportunity strategically located in Burke County, Georgia, one of the most compelling emerging markets for hyperscale, AI, HPC, and cloud data cent

Description

The property is positioned within the shadow of the Vogtle Electric Generating Plant, the largest nuclear power facility in the United States, and benefits from proximity to high-voltage transmission infrastructure, regional fiber connectivity, and a pro-growth economic development environment actively pursuing large-scale technology investment. Unlike the increasingly constrained Atlanta metropolitan market, Burke County offers developers the opportunity to establish large-scale digital infrastructure campuses in a jurisdiction that maintains a favorable entitlement environment, lower land acquisition costs, and access to significant state and local incentives. The site's combination of scale, infrastructure proximity, and strategic location creates a rare opportunity for developers, hyperscalers, private equity investors, and infrastructure funds seeking a future-ready site capable of supporting significant power-intensive development. INVESTMENT HIGHLIGHTS 1. Strategic Location Near the Largest Nuclear Power Plant in America The property is located in Burke County, home to the Vogtle Electric Generating Plant. Vogtle is the largest nuclear generating facility in the United States with approximately: • 4,800 MW generation capacity • Four operational reactors • AP1000 advanced nuclear technology • Long-term baseload power generation For power-intensive industries such as AI and hyperscale data centers, proximity to reliable baseload generation represents one of the most important site-selection criteria. 2. Access to High-Voltage Transmission Infrastructure The property is located near significant transmission assets: • 500kV West McIntosh Transmission line - Within 3 Miles • 115kV Transmission Line - Within 4 Miles • Regional Fiber Network - Adjacent 3. Adjacent Fiber Infrastructure Regional Xfinity fiber reportedly runs along portions of the property boundary. Benefits include: • Reduced fiber extension costs • Faster deployment timelines • Diverse connectivity options • Access to regional and long-haul transport routes • Improved carrier-neutral potential 4. Favorable Regulatory Environment Unlike many jurisdictions implementing restrictive data center ordinances, Burke County currently operates under its traditional land development code. Current observations include: • No dedicated data center ordinance • No known data center moratorium • Existing industrial development pathways • Active economic development efforts • Experience supporting large-scale energy infrastructure This provides developers with flexibility while local governments continue to evaluate future technology-focused development regulations. PROPOSED LAND VALUATION FRAMEWORK • Shovel ready Tier-1 sites score 85-100% with a value play of $300k - $450k /MW/Acre • Shovel ready Tier-2 sites score 75-85% with a value play of $200k - $350k /MW/Acre • The subject property is well positioned with strong fundamentals and in its current state, scores 50% on Coldwell Banker's data center site selection marker. Also, its strategic location aligns with the city and county land development code and makes it viable for entitlement approvals.

Exceptionnellement adapté aux voitures
100/100
Inaccessible en vélo
10/100
  • ID d’inscription: 41056850

  • Date de mise sur le marché: 2026-06-25

  • Dernière mise à jour:

  • Adresse: Highway 23, Waynesboro, GA 30830

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}