Se Connecter/S’inscrire
Votre courriel a été envoyé.
Hwy 79 & FM 3349
Hutto, TX 78634
Building 2 · Industriel Propriété À vendre


Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Located minutes from Samsung's Taylor semiconductor facility.
- Planned Class A industrial park spanning approximately 188 acres.
- Positioned within Williamson County's expanding labor market.
- Direct access to Highway 79 with connectivity to SH-130 and SH-95.
- Utility infrastructure available to support large-scale industrial users.
- Access to Austin, Taylor, Round Rock, and regional manufacturing hubs.
Résumé de l'annonce
Hutto Mega TechCenter is a master-planned Class A industrial development strategically positioned at Highway 79 and FM 3349 in Hutto, one of the fastest-growing communities within the Austin metropolitan area. Planned across approximately 188 acres, the development is designed to accommodate distribution, logistics, manufacturing, semiconductor suppliers, and advanced industrial users seeking access to Central Texas' expanding technology corridor.
The project's location places tenants within minutes of Samsung's new semiconductor fabrication facility in Taylor and provides direct connectivity to SH-130, SH-95, and major regional transportation routes. The site offers access to a growing labor pool throughout Williamson County while benefiting from proximity to Austin, Round Rock, Georgetown, Pflugerville, and Taylor. Austin-Bergstrom International Airport, Tesla Gigafactory, Applied Materials, and The Domain are all accessible within regional commuting distances.
Infrastructure is a significant differentiator for the development, with water and wastewater service available and a 600MW substation with adjacent 345KV transmission lines supporting power-intensive operations. The business park is planned for multiple industrial building configurations, including rear-load and cross-dock facilities with modern specifications suited for warehousing, distribution, manufacturing support, and technology-related users. Hutto Mega TechCenter combines large-scale industrial capacity, infrastructure readiness, and access to one of the nation's fastest-growing semiconductor and advanced manufacturing corridors.
The project's location places tenants within minutes of Samsung's new semiconductor fabrication facility in Taylor and provides direct connectivity to SH-130, SH-95, and major regional transportation routes. The site offers access to a growing labor pool throughout Williamson County while benefiting from proximity to Austin, Round Rock, Georgetown, Pflugerville, and Taylor. Austin-Bergstrom International Airport, Tesla Gigafactory, Applied Materials, and The Domain are all accessible within regional commuting distances.
Infrastructure is a significant differentiator for the development, with water and wastewater service available and a 600MW substation with adjacent 345KV transmission lines supporting power-intensive operations. The business park is planned for multiple industrial building configurations, including rear-load and cross-dock facilities with modern specifications suited for warehousing, distribution, manufacturing support, and technology-related users. Hutto Mega TechCenter combines large-scale industrial capacity, infrastructure readiness, and access to one of the nation's fastest-growing semiconductor and advanced manufacturing corridors.
Faits sur la propriété
| Type de vente | Investissement | Aire du bâtiment louable | 378 560 pi² |
| Type de propriété | Industriel | Nombre d’étages | 1 |
| Sous-type de propriété | Centre de distribution | Année de construction | 2028 |
| Classe d’immeuble | A | Ratio de stationnement | 0,79/1 000 pi² |
| Taille du lot | 100,49 AC | Effacer hauteur du plafond | 36’ |
| État de la construction | Proposé | Nbre de quais à portes élevées/de chargement | 77 |
| Zonage | LI-1 - Industrie légère | ||
| Type de vente | Investissement |
| Type de propriété | Industriel |
| Sous-type de propriété | Centre de distribution |
| Classe d’immeuble | A |
| Taille du lot | 100,49 AC |
| État de la construction | Proposé |
| Aire du bâtiment louable | 378 560 pi² |
| Nombre d’étages | 1 |
| Année de construction | 2028 |
| Ratio de stationnement | 0,79/1 000 pi² |
| Effacer hauteur du plafond | 36’ |
| Nbre de quais à portes élevées/de chargement | 77 |
| Zonage | LI-1 - Industrie légère |
Impôts fonciers
| Numéro de lot | R020941 | Évaluation des bâtiments | 0 $ CAD |
| Évaluation du terrain | 0 $ CAD | Évaluation totale | 72 780 $ CAD |
Impôts fonciers
Numéro de lot
R020941
Évaluation du terrain
0 $ CAD
Évaluation des bâtiments
0 $ CAD
Évaluation totale
72 780 $ CAD
1 de 3
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
