Se Connecter/S’inscrire
Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Approximately 707,514 tonnes of sand & gravel reserves remaining
- The planning permissions for the hard rock and sand & gravel quarries expire in May 2042 and November 2039, respectively
- Approximately 927,609 tonnes of permitted hard rock reserves remaining
Résumé de l'annonce
The quarries are currently worked by Bridgend Aggregates Limited, who have been operating from the property for over thirty years. From the property they supply a variety of
grades of crushed rock as well as bagged aggregates, specialist sand, gravels, decorative chips and ready-mix concrete. The quarries are situated west of the village of King Edward, accessed by private road off the A947 in between the towns of Turriff and Banff. Elgin is 40 miles west, Aberdeen is 40 miles south and Fraserburgh is 20 miles east. The extant planning permissions for the quarrying activities are APP/2021/1937 and APP/2013/1064. The consents currently permit for extraction from the hard rock quarry until 2042 and the sand & gravel quarry until 2039. Within the processing and recycling area there is a main reception and office space, weighbridge, fully equipped HGV workshop, store, wash plant with filter press and modern concrete batching plant with laboratory as well as ancillary industrial buildings. The in-situ plant & machinery, including crushers and dumpers, are available together with the land interest and or separately. An asset register is included within our online data room.
grades of crushed rock as well as bagged aggregates, specialist sand, gravels, decorative chips and ready-mix concrete. The quarries are situated west of the village of King Edward, accessed by private road off the A947 in between the towns of Turriff and Banff. Elgin is 40 miles west, Aberdeen is 40 miles south and Fraserburgh is 20 miles east. The extant planning permissions for the quarrying activities are APP/2021/1937 and APP/2013/1064. The consents currently permit for extraction from the hard rock quarry until 2042 and the sand & gravel quarry until 2039. Within the processing and recycling area there is a main reception and office space, weighbridge, fully equipped HGV workshop, store, wash plant with filter press and modern concrete batching plant with laboratory as well as ancillary industrial buildings. The in-situ plant & machinery, including crushers and dumpers, are available together with the land interest and or separately. An asset register is included within our online data room.
Faits sur la propriété
| Type de vente | Investissement | Type de propriété | Terrain |
| Ancienneté | Pleine propriété | Sous-type de propriété | Terrain industriel |
| Nombre de lots | 1 | Taille totale du lot | 66,86 AC |
| Type de vente | Investissement |
| Ancienneté | Pleine propriété |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain industriel |
| Taille totale du lot | 66,86 AC |
1 Lot disponible
Lot
| Taille du lot | 66,86 AC |
| Taille du lot | 66,86 AC |
This quarry is available by way of freehold sale or lease.
Description
The operational quarry, opened in 1994, extends to 66.86 acres (27.06 hectares)
1 1
1 de 10
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
1 de 1
Présenté par
King Edward - Bridgend Quarry
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.



