Se Connecter/S’inscrire
Votre courriel a été envoyé.
Lightfighter Drive - Campus Town Phase 1 Hotel Pad Lot • Terrain commercial • 2,2 Acres • Seaside, CA 93955



Certaines informations ont été traduites automatiquement.
Résumé de l'annonce
Offers Due May 5, 2026
2.2-Acre Hotel Development Opportunity
A rare opportunity to acquire a 2.2-acre hotel pad delivered in blue-top lot condition, located within the Campus Town Project, a transformative mixed-use development currently under construction.
Upon completion, Campus Town will span approximately 122.23 acres and feature a dynamic mix of residential, hospitality, commercial, and recreational uses, including:
• 1,485 residential housing units
• 250 hotel rooms
• 75 hostel beds
• 150,000 SF of retail, dining, and entertainment space
• 50,000 SF of office, flex, makerspace, and light industrial space
The project will also include extensive open space and amenities, including approximately 9 acres of public open space and 3.3 acres of private open space, along with roadways, parking, and supporting infrastructure.
Positioned within a vibrant master-planned environment, the hotel pad presents a unique opportunity to develop a hospitality asset within one of the region’s most significant mixed-use developments.
2.2-Acre Hotel Development Opportunity
A rare opportunity to acquire a 2.2-acre hotel pad delivered in blue-top lot condition, located within the Campus Town Project, a transformative mixed-use development currently under construction.
Upon completion, Campus Town will span approximately 122.23 acres and feature a dynamic mix of residential, hospitality, commercial, and recreational uses, including:
• 1,485 residential housing units
• 250 hotel rooms
• 75 hostel beds
• 150,000 SF of retail, dining, and entertainment space
• 50,000 SF of office, flex, makerspace, and light industrial space
The project will also include extensive open space and amenities, including approximately 9 acres of public open space and 3.3 acres of private open space, along with roadways, parking, and supporting infrastructure.
Positioned within a vibrant master-planned environment, the hotel pad presents a unique opportunity to develop a hospitality asset within one of the region’s most significant mixed-use developments.
Faits sur la propriété
| Type de vente | Investissement | Sous-type de propriété | Terrain commercial |
| Nombre de lots | 1 | Taille totale du lot | 2,20 AC |
| Type de propriété | Terrain |
| Type de vente | Investissement |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain commercial |
| Taille totale du lot | 2,20 AC |
1 Lot disponible
Lot
| Taille du lot | 2,20 AC |
| Taille du lot | 2,20 AC |
2.2-acre hotel pad to be delivered in blue-top lot condition
1 1
1 de 4
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
1 de 1
Présenté par
Lightfighter Drive - Campus Town Phase 1 Hotel Pad
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
