Partager cette annonce

Message

893 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Contactez le courtier pour plus d'informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Faits saillants de l'investissement

  • 55± acre development opportunity
  • Large contiguous industrial site
  • Ideal for campus or large industrial user
  • Located along Muller Parkway growth corridor
  • Utilities available to property

Résumé de l'annonce

Incredible price on prime industrial land! These two contiguous parcels at Buckeye Industrial Park present a rare opportunity to acquire approximately 55.34 acres of contiguous industrial development land in one of the Carson Valley’s fastest-growing commercial corridors.
The property is strategically positioned along Muller Parkway, the new US-395 bypass currently under construction in Minden, Nevada. This major infrastructure project is designed to divert regional traffic around downtown Minden and Gardnerville while creating a new commercial and industrial development corridor throughout the valley.
As the bypass nears completion, properties along Muller Parkway are expected to experience increased visibility, improved regional access, and growing commercial demand.
Combining these two lots creates one of the largest industrial development sites currently available in the Carson Valley, offering exceptional flexibility for large-scale projects including corporate campuses, distribution facilities, industrial parks, flex space developments, or regional operations centers.
The parcels are part of Buckeye Industrial Park, where several properties have already sold and development activity continues to increase as the surrounding area grows.
The property also sits adjacent to a major planned residential development currently in escrow, expected to bring several thousand new homes to the surrounding area over time. This residential growth will further support employment centers, commercial services, and industrial users within the corridor.
Utilities including sewer and water are available to the site, with gas, electricity, and fiber infrastructure located nearby.
With strong regional access to Reno, Carson City, and Northern California, this combined parcel offering provides a unique opportunity for developers or end users to secure a large industrial development site in a rapidly expanding Northern Nevada market.

Faits sur la propriété

Prix 9 932 500 $ CAD
Type de vente Investissement ou propriétaire utilisateur
Nombre de lots 1
Type de propriété Terrain
Sous-type de propriété Terrain commercial
Utilisation proposée
Commercial
  • Industriel
  • Usage mixte
  • Distribution
  • Parc industriel
  • Parc de bureaux
  • Centre de magasins
Taille totale du lot 55,34 AC
Zonage Light Industrial (L-1) - Light Industrial (L-1) – Build Ready

1 Lot disponible

Lot

Prix 9 932 500 $ CAD
Prix par AC 179 481,39 $ CAD
Taille du lot 55,34 AC

55.34± acre industrial development opportunity combining two parcels along the Muller Parkway corridor in Minden, NV. Large flexible site ideal for corporate campus, distribution, or industrial development.

Description

The combined offering of these two lots totals approximately 55.34 acres within Buckeye Industrial Park in Minden, Nevada and represents one of the largest contiguous industrial development opportunities currently available in the Carson Valley. The property is positioned near Muller Parkway, the new US-395 bypass that is currently being developed to improve traffic circulation throughout the Carson Valley while opening new areas for commercial and industrial development. Portions of the roadway are already constructed and the remaining segments are expected to be completed soon. As the project nears completion, the Muller Parkway corridor is emerging as one of the region’s most promising locations for new commercial and industrial investment. The combined parcels create a large, flexible development footprint suitable for a wide range of uses including: • Corporate headquarters or campus-style development • Warehouse and distribution facilities • Industrial park development • Flex industrial space • Contractor service operations • Regional logistics or operations centers Utilities including sewer and water are available to the property, and the site has been rough graded in preparation for future development. Buckeye Industrial Park has already experienced several parcel sales and increasing interest from industrial users and service businesses seeking locations within the growing Carson Valley market. In addition, the property is located adjacent to a large planned residential community currently in escrow that is expected to bring substantial housing growth to the area over time. This residential expansion will increase demand for nearby employment centers, commercial services, and supporting industrial uses. The combination of infrastructure investment, residential growth, and regional accessibility makes these combined lots a unique opportunity to acquire large-scale industrial development land in Northern Nevada.

Exceptionnellement facile d’accès en voiture
90/100
Assez praticable en vélo
30/100
  • ID d’inscription: 39723850

  • Date de mise sur le marché: 2026-03-10

  • Dernière mise à jour:

  • Adresse: Muller Parkway & Bently Parkway, Minden, NV 89423

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}