Se Connecter/S’inscrire
Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS DE L'INVESTISSEMENT
- New Alameda Road Frontage
- Located just North of Deer Valley Airport Access to 3 Full Diamond Interchanged on I-17 on Loop 101 Freeway
- Less than 5 miles from the $40 billion state-of-the-art Taiwan Semiconductor Manufacturing Plant
RÉSUMÉ DE L'ANNONCE
Taiwan Semiconductor Manufacturing Co. (TSMC) is building the massive chip-making facility on a large 1129 acres of land, with an even larger $12 billion investment. TSMC’s new facility is near Interstate 17 and Loop 303, which the Taiwanese giant purchased back in December 2020.
The new facility in Arizona should be operational by 2024. “Structural construction of the fabrication facility, called the fab, is nearing completion, and the office building has about half of its glasswork completed., there are currently 38 cranes working on the massive site”.
TSMC is training around 500 employees from Arizona, over in Taiwan right now where TSMC has its feet firmly planted. But in 2023, TSMC is expected to have over 2000 people working in the Arizona plant.
Another positive for the US is that the existing semiconductor industry in Arizona has pulled the attention of other semiconductor industry companies to focus on Arizona, ever since TSMC announced its plans for the plant in Arizona.
The new facility in Arizona should be operational by 2024. “Structural construction of the fabrication facility, called the fab, is nearing completion, and the office building has about half of its glasswork completed., there are currently 38 cranes working on the massive site”.
TSMC is training around 500 employees from Arizona, over in Taiwan right now where TSMC has its feet firmly planted. But in 2023, TSMC is expected to have over 2000 people working in the Arizona plant.
Another positive for the US is that the existing semiconductor industry in Arizona has pulled the attention of other semiconductor industry companies to focus on Arizona, ever since TSMC announced its plans for the plant in Arizona.
FAITS SUR LA PROPRIÉTÉ
| Type de vente | Investissement ou propriétaire utilisateur | Sous-type de propriété | Terrain industriel |
| Nombre de lots | 1 | Utilisation proposée | Unités d’appartements |
| Type de propriété | Terrain | Taille totale du lot | 2,80 AC |
| Zonage | R-43 - R-43, Résidentiel | ||
| Type de vente | Investissement ou propriétaire utilisateur |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain industriel |
| Utilisation proposée | Unités d’appartements |
| Taille totale du lot | 2,80 AC |
| Zonage | R-43 - R-43, Résidentiel |
1 LOT DISPONIBLE
Lot
| Taille du lot | 2,80 AC |
| Taille du lot | 2,80 AC |
1 1
Impôts fonciers
| Numéros de lot | Évaluation des bâtiments | 0 $ CAD | |
| Évaluation du terrain | 34 770 $ CAD | Évaluation totale | 34 770 $ CAD |
Impôts fonciers
Numéros de lot
Évaluation du terrain
34 770 $ CAD
Évaluation des bâtiments
0 $ CAD
Évaluation totale
34 770 $ CAD
1 de 2
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D MATTERPORT
PHOTOS
VUE DEPUIS LA RUE
RUE
CARTE
1 de 1
Présenté par
NEC Alameda Rd & 11th Ave
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.

