Votre courriel a été envoyé.
Gemini Business Park Twin Falls, ID 83301 4 800–256 000 pi² d'espace disponible • Industriel



Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS DU PARC
- Build-to-Suit Available.
- Insulated Wall Panels for High R-Value.
- Minutes from I-84 and downtown Twin Falls.
- Brand New Class A Industrial Space.
- High Skylight Count.
- Directly adjacent to Clif Bar, Jayco & Chobani.
FAITS SUR LE PARC
| Superficie totale disponible | 256 000 pi² | Type de parc | Parc industriel |
| Min. divisible | 4 800 pi² |
| Superficie totale disponible | 256 000 pi² |
| Min. divisible | 4 800 pi² |
| Type de parc | Parc industriel |
TOUS LES ESPACES DISPONIBLES(2)
Afficher les taux de location en
- ESPACE
- TAILLE
- TERME
- TAUX DE LOCATION
- UTILISATION DE L’ESPACE
- ÉTAT
- DISPONIBLE
Since 2023, Summit Creek Development (SCD) has constructed over 200,000 square feet of brand-new industrial space across four buildings and is planning to deliver another 800,000 square feet in the next several years. While many projects claim a Class A designation, Gemini Business Park has truly earned this pedigree. Each concrete tilt building is constructed with an insulated sandwich panel design, providing a high R-Value in the walls and roof system. Every building features a high skylight count, reducing the need for interior lighting. The project also includes concrete roadways, parking areas, and truck courts. With flexible unit sizes, numerous dock-high and grade-level doors, and 28’–32’ clear heights, Gemini can accommodate a wide range of tenants. Located directly adjacent to the area’s largest employers and manufacturers, Gemini Business Park is home to many global and national companies. With the current expansion of Chobani and the pending expansion of Clif Bar, this is the ideal location for industrial users of all sizes. Interstate 84 is only a few minutes away, as are the amenities of downtown Twin Falls. As the Developer, Landlord, and General Contractor, SCD streamlines the tenant experience by offering a single point of contact for lease negotiations, tenant improvements, and build-to-suit solutions. For new projects, Summit can deliver a building in an average of 12 months. With another 56,000 square feet set to deliver in Spring 2026—and the potential to deliver an additional 120,000 square feet in Fall 2026—Summit Creek Development is well-positioned to accommodate your business in a timely and cost-effective manner.
- Comprend 2 700 pi² d’espace de bureau dédié
- New Development
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| 1er étage | 4 800 à 56 000 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | - | 2026-11-01 |
Champlin Way - 1er étage
- ESPACE
- TAILLE
- TERME
- TAUX DE LOCATION
- UTILISATION DE L’ESPACE
- ÉTAT
- DISPONIBLE
Since 2023, Summit Creek Development (SCD) has constructed over 200,000 square feet of brand-new industrial space across four buildings and is planning to deliver another 800,000 square feet in the next several years. While many projects claim a Class A designation, Gemini Business Park has truly earned this pedigree. Each concrete tilt building is constructed with an insulated sandwich panel design, providing a high R-Value in the walls and roof system. Every building features a high skylight count, reducing the need for interior lighting. The project also includes concrete roadways, parking areas, and truck courts. With flexible unit sizes, numerous dock-high and grade-level doors, and 28’–32’ clear heights, Gemini can accommodate a wide range of tenants. Located directly adjacent to the area’s largest employers and manufacturers, Gemini Business Park is home to many global and national companies. With the current expansion of Chobani and the pending expansion of Clif Bar, this is the ideal location for industrial users of all sizes. Interstate 84 is only a few minutes away, as are the amenities of downtown Twin Falls. As the Developer, Landlord, and General Contractor, SCD streamlines the tenant experience by offering a single point of contact for lease negotiations, tenant improvements, and build-to-suit solutions. For new projects, Summit can deliver a building in an average of 12 months. With another 56,000 square feet set to deliver in Spring 2026—and the potential to deliver an additional 120,000 square feet in Fall 2026—Summit Creek Development is well-positioned to accommodate your business in a timely and cost-effective manner.
- New Development
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| 1er étage | 4 800 à 200 000 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | - | 2026-10-01 |
Champlin Way - 1er étage
Champlin Way - 1er étage
| Taille | 4 800 à 56 000 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | - |
| Disponible | 2026-11-01 |
Since 2023, Summit Creek Development (SCD) has constructed over 200,000 square feet of brand-new industrial space across four buildings and is planning to deliver another 800,000 square feet in the next several years. While many projects claim a Class A designation, Gemini Business Park has truly earned this pedigree. Each concrete tilt building is constructed with an insulated sandwich panel design, providing a high R-Value in the walls and roof system. Every building features a high skylight count, reducing the need for interior lighting. The project also includes concrete roadways, parking areas, and truck courts. With flexible unit sizes, numerous dock-high and grade-level doors, and 28’–32’ clear heights, Gemini can accommodate a wide range of tenants. Located directly adjacent to the area’s largest employers and manufacturers, Gemini Business Park is home to many global and national companies. With the current expansion of Chobani and the pending expansion of Clif Bar, this is the ideal location for industrial users of all sizes. Interstate 84 is only a few minutes away, as are the amenities of downtown Twin Falls. As the Developer, Landlord, and General Contractor, SCD streamlines the tenant experience by offering a single point of contact for lease negotiations, tenant improvements, and build-to-suit solutions. For new projects, Summit can deliver a building in an average of 12 months. With another 56,000 square feet set to deliver in Spring 2026—and the potential to deliver an additional 120,000 square feet in Fall 2026—Summit Creek Development is well-positioned to accommodate your business in a timely and cost-effective manner.
- Comprend 2 700 pi² d’espace de bureau dédié
- New Development
Champlin Way - 1er étage
| Taille | 4 800 à 200 000 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | - |
| Disponible | 2026-10-01 |
Since 2023, Summit Creek Development (SCD) has constructed over 200,000 square feet of brand-new industrial space across four buildings and is planning to deliver another 800,000 square feet in the next several years. While many projects claim a Class A designation, Gemini Business Park has truly earned this pedigree. Each concrete tilt building is constructed with an insulated sandwich panel design, providing a high R-Value in the walls and roof system. Every building features a high skylight count, reducing the need for interior lighting. The project also includes concrete roadways, parking areas, and truck courts. With flexible unit sizes, numerous dock-high and grade-level doors, and 28’–32’ clear heights, Gemini can accommodate a wide range of tenants. Located directly adjacent to the area’s largest employers and manufacturers, Gemini Business Park is home to many global and national companies. With the current expansion of Chobani and the pending expansion of Clif Bar, this is the ideal location for industrial users of all sizes. Interstate 84 is only a few minutes away, as are the amenities of downtown Twin Falls. As the Developer, Landlord, and General Contractor, SCD streamlines the tenant experience by offering a single point of contact for lease negotiations, tenant improvements, and build-to-suit solutions. For new projects, Summit can deliver a building in an average of 12 months. With another 56,000 square feet set to deliver in Spring 2026—and the potential to deliver an additional 120,000 square feet in Fall 2026—Summit Creek Development is well-positioned to accommodate your business in a timely and cost-effective manner.
- New Development
Présenté par
Gemini Business Park | Twin Falls, ID 83301
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.

