Votre courriel a été envoyé.
Riverport Parkway - Riverport Commerce Center | Phase 3 Lots • Terrain industriel • 30-120 Acre • Hardeeville, SC 29927

Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Flexible Pod sizes ranging from ±30 - 150 AC
- Only 10 Miles from the GPA's Garden City Terminal
- Over 3.9 million SF of development potential
Résumé de l'annonce
The offering consists of three separate industrial pods, and Seller will entertain offers for the individual pods or for multiple pods. (Flexible Pod Sizes ranging from 30-150 AC)
Pod A: ±201.74 Gross AC with three buildings (±1,616,090 SF)
Pod B: ±123.74 Gross AC with two buildings (±1,114,686 SF)
Pod C: ±63.19 Gross AC with three buildings (±380,700 SF)
Pod D: ±65.44 Gross AC with 1 building (±910,000 SF)
Completed Entitlements
• Zoned Industrial (City of Hardeeville, SC)
• 404 Wetland Permit Complete
• Wetlands Mitigated for warehouse construction per approved Master Plan
• Initial Master Plan Approved (City of Hardeeville, SC)
• Master Utility Agreement with Dominion Power
• Riverport Parkway Extension Building Permit in hand - construction to start Q2 2026
• Water/Sewer Development Agreement Complete with utility infrastructure under construction
Faits sur la propriété
2 Lots disponibles
Lot 1
| Taille du lot | 30,00 AC |
| Taille du lot | 30,00 AC |
Industrial land 10 miles from Port of Savannah. Entitled, utility-served, with new parkway access. Seller offering flexible pod sizes ±30–150 AC. Ideal for logistics and warehouse development.
Lot
| Taille du lot | 120,00 AC |
| Taille du lot | 120,00 AC |
Industrial land 10 miles from Port of Savannah. Entitled, utility-served, with new parkway access. Seller offering flexible pod sizes ±30–150 AC. Ideal for logistics and warehouse development.
Description
Completed Entitlements: • Zoned Industrial (City of Hardeeville, SC) • 404 Wetland Permit Complete • Wetlands Mitigated for warehouse construction per approved Master Plan • Initial Master Plan Approved (City of Hardeeville, SC) • Master Utility Agreement with Dominion Power • Riverport Parkway Extension Building Permit in hand - construction to start Q2 2026 • Water/Sewer Development Agreement Complete with utility infrastructure under construction
Présenté par
Riverport Parkway - Riverport Commerce Center | Phase 3
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
