Votre courriel a été envoyé.
Giga Flex IOS Austin, TX 78725 24 000 pi² d'espace disponible • Industriel



Certaines informations ont été traduites automatiquement.
Faits saillants du parc
- Directly across from the Tesla Gigafactory.
- Easy access to SH-130 and FM 973.
- Dedicated outdoor storage accompanies each building.
- Fully fenced and secured industrial site.
- Five standalone warehouse buildings.
- Convenient access to Austin-Bergstrom International Airport.
Faits sur le parc
| Superficie totale disponible | 24 000 pi² | Type de parc | Parc industriel |
| Superficie totale disponible | 24 000 pi² |
| Type de parc | Parc industriel |
Tous les espaces disponibles(1)
Afficher les taux de location en
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- Aménagement
- Disponible
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | Aménagement | Disponible |
| 1er étage | 24 000 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | - | À déterminer |
SH-130 & FM 973 - 1er étage
SH-130 & FM 973 - 1er étage
| Taille | 24 000 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| Aménagement | - |
| Disponible | À déterminer |
Aperçu du parc
GIGA FLEX IOS is a two-phase industrial development located at the intersection of SH-130 and FM 973 in East Austin. Positioned directly across from the Tesla Gigafactory, the project offers a combination of warehouse and outdoor storage functionality designed to accommodate a variety of industrial users seeking regional connectivity and operational flexibility. The development consists of five standalone buildings with dedicated outdoor storage areas, providing tenants with a secure and efficient environment for distribution, contractor operations, equipment storage, and fleet-based businesses. The fully fenced site is planned with grade-level loading and 24-foot clear heights to support a range of warehouse and logistics requirements. The property's location offers immediate access to SH-130 and FM 973, providing convenient connections throughout the Austin metro area and to major transportation corridors. Users will also benefit from proximity to Austin-Bergstrom International Airport and one of the region's most significant employment and industrial hubs surrounding the Tesla Gigafactory. Phase I includes Buildings 1, 2, and 3, with delivery scheduled for May 2026. Phase II is planned to include Buildings 4 and 5. The combination of warehouse space, dedicated outdoor storage, secure site design, and access to major transportation infrastructure positions GIGA FLEX IOS to serve a broad range of industrial occupiers.
Présenté par
Giga Flex IOS | Austin, TX 78725
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.


