Se Connecter/S’inscrire
Votre courriel a été envoyé.
US-83
Laredo, TX 78045
Township Logistics Park at Talise · Industriel Propriété À louer
·
1 049 071 pi²


Certaines informations ont été traduites automatiquement.
Faits saillants du parc
- Four-building Phase 1 with 1,049,071 SF of speculative space and design flexibility.
- CTPAT-compliant infrastructure with provisions for cold storage and fueling station.
- Integrated within a 13,000-acre master-planned development supporting industrial, commercial, and future growth.
- Strategic location near IH-35, TX-255, and Port Laredo for seamless border connectivity.
- Expandable cross-dock options in BLDG 6, with significant trailer and car parking capacity.
- Positioned 140 miles north of Monterrey, facilitating access to Mexico’s major industrial zone.
Faits sur le parc
| Superficie totale disponible | 1 049 071 pi² | Caractéristiques | Terrain clôturé |
| Type de parc | Parc industriel |
| Superficie totale disponible | 1 049 071 pi² |
| Type de parc | Parc industriel |
| Caractéristiques | Terrain clôturé |
Caractéristiques et commodités
- Terrain clôturé
Aperçu du parc
The Township at Talise is in North Laredo, Texas, within a planned logistics-oriented community anchored around major transportation corridors. The site lies near Interstate 35, TX-255, and Port Laredo, offering connectivity to existing and proposed regional routes including the future I-27 extension. The industrial park is part of a large-scale development that includes multiple phases, land parcels, and infrastructure improvements. Phase 1 consists of four distribution buildings, with rear-load and cross-dock configurations, on-site trailer and vehicle parking, and proximity to cross-border trade routes and commercial services.
1 de 6
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
