Pecos Land for Sale
Rare, 2.4-gigawatt energy campus that is development-ready, offering immediate access to gas turbines and genset packages. The seller's family business, a global power generation firm, provides direct access to aeroderivative genset packages and over a gigawatt of used and new turbines for immediate sale, with Phase 1 (240 MW) deployable by Q4 2026. Installation, operations support, and maintenance can be provided for all genset packages.
Two 36-inch natural gas pipelines (Kinetic & OneOk) cross the parcel, each with a capacity of 1.7 BCF. After nearly a year, the seller has a gas term sheet in hand stating the WAHA index plus a 40-cent transport fee for up to 400,000 MMBTU of gas. Two gas meters will be installed, each with a 200,000 MMBTU capacity, or approximately 1,200 MW of electrical capacity each (2.4 gigawatts total). The seller will wire $4,000,000 on November 12, 2026, to construct the first gas meter, which is expected to take 140 to 170 days to complete and be ready for gas turbine hook-up.
The seller's family-owned enterprise operates power plants and turbine generation facilities in over 37 countries, with nearly 1,000 people employed globally. The average cost to operate turbines ranges from 0.5 to 1.5 cents per kw/h, depending on the O&M tier package the owner desires, and can also be handled by the family business if the buyer chooses. The enterprise's headquarters is in Corpus Christi, Texas, making operations on this Pecos, Texas, site even more ideal, as it is only hours away. With six 50-ton overhead cranes at their Corpus Christi headquarters, the family business also handles all aspects of turbine and engine refurbishment, except for a 50,000-hour major overhaul, typically only performed by the OEM.
Relationships with SCR manufacturing companies are in place so that all turbines purchased and deployed will have proper SCR exhaust add-ons to reduce the NOX PPM down from 25 PPM to 5-8PPM. This allows for an expedited fast-track permitting process with the TCEQ, which is nearly automatic, and enables buyers to start construction within a matter of a few months. Four commercial water wells (two active) on-site produce 3,000 gallons per minute, and a long-haul fiber line with dark fiber available lies 4.5 miles north.
Grid interconnect is underway via Vega. Buyer may opt for a grid-tied or private Behind-the-Meter setup. A 765-kV transmission line, known as the Big Hill to Sand Lake 765-kV Transmission Line Project, is expected to be approved early in 2026, with completion anticipated between 2029 and 2030. Additionally, Microsoft's $14 billion energy campus with Nscale is just 15 minutes East.
Few companies have begun drilling in the Alpine High zone because there is already an abundance of excess gas coming from other major zones in the Permian Basin. Again, just another example of why this area is positioned to be a superior location for AI and other hyperscale companies.
The seller has agreed to pay a 7% commission to the buyer's broker/agent, a $1,140,000 commission check payable to the broker/agent at the full asking price. The family's global enterprise is willing to consider an exclusive agreement with the buyer of this deal for all turbines in the pipeline, provided the logistics are feasible. The sellers are not interested in selling turbines alone. The family enterprise can guarantee 2,400 MW of turbine capacity by 2029 with ramp-up phases between now and then.
Serious inquiries only. No wholesalers. This is a large project with incredible long-term scalability. A 12% non-refundable deposit is required for any contract feasibility period. The seller is willing to accept Cash, Bitcoin, or stock options as payment, depending on the buyer and the structure.