Naples Land for Sale - Outlying Collier County
——————————————————————
STRATEGIC DUAL-LOT ASSEMBLAGE
——————————————————————
Consisting of two adjacent properties, this 7.48± AC assemblage offers 1,142± linear feet of premium dual-street frontage. The site is optimally configured for high-capacity institutional scale with three (3) strategic ingress/egress points: dual curb cuts on Desoto Blvd N and a dedicated service/staff entrance on 33rd Ave NE. This multi-point access configuration is critical for specialized circulation, allowing for the necessary separation of public traffic from service, delivery, and emergency vehicles.
——————————————————————
2026 MEDICAL & INSTITUTIONAL DEMAND NODE
——————————————————————
Optimized for the 2026 shift toward decentralized, high-tech community care, this assemblage is uniquely positioned for an AI-Driven Diagnostic Imaging Center, Ambulatory Surgery Center (ASC), or specialized Medical Clinic. Site-direct FPL and high-capacity fiber are at the boundary to support the heavy power/data loads of next-gen radiology suites. Unlike raw land, the site offers a significant "Speed-to-Market" advantage with an established 10,000± SF elevated building footprint, providing a settled foundation for immediate site preparation.
————————————————————————
CATALYST: 2026 POLICY-ALIGNED ASSET
————————————————————————
The Rural Golden Gate Estates Restudy serves as a powerful de-risking mechanism for this location. By modernizing the Growth Management Plan to support the regional expansion, the County is effectively signaling this site’s transition toward higher-density commercial and community-essential use. For an institutional buyer, this offers a formalized bridge toward "Highest and Best Use" by aligning with updated county planning goals and compressing the traditional development arc.
——————————————————
DRAINAGE & INFRASTRUCTURE VALUE
——————————————————
A standout feature is the existing 2.6± AC retention basin, a physical infrastructure asset ready for runoff compliance. By utilizing existing capacity to satisfy ERP regulations, a buyer bypasses the costly site-prep hurdles and 12-18 month construction lag that typically stall projects. This infrastructure, combined with the 10k SF pad, represents a $250k+ immediate credit in soft costs and prevents months of "unproductive holding costs" associated with new excavation.
————————————————
CONDITIONAL USE ASSET
————————————————
As the surrounding corridor transitions toward a denser, service-oriented landscape, this site serves as a vital bridge for community-essential infrastructure. This asset is strategically positioned to capture surging demand for Medical Clinics, Diagnostic Imaging Centers, Ambulatory Surgery Centers (ASC), Assisted Living Facilities (ALF), Nursing Homes, Day Care Centers, and Schools (K-12/Charter). These uses are explicitly identified as allowable Conditional Uses (CU) within the North Naples market.
—————————————————
CAPTIVE CONSUMER BASE
—————————————————
Proximity to major master-planned villages—including Rivergrass, Longwater, Bellmar, and SkySail—represents 9,300+ immediate rooftop deliveries. This massive residential influx creates a surging demand for specialized medical and commercial services. Positioned as a primary service node, this location is uniquely suited to capture the needs of the currently developing Town of Big Cypress corridor.
————————————————————
OPTIMIZED DEVELOPMENT YIELD
————————————————————
Unlike standard parcels where retention requirements consume 25-30% of buildable acreage, this site is engineered for maximum density. The centralized drainage solution allows a developer to utilize a significantly higher percentage of the "upland" footprint for vertical construction. This translates directly to a higher potential bed count for ALFs or increased square footage for medical offices, driving a superior yield-on-cost and a "first-to-market" advantage.
—————————————————————
THE FIRST TO MARKET ADVANTAGE
—————————————————————
Timing is as critical as location. This site offers a "first-to-market" advantage through its advanced physical state. A buyer inherits a project where the most significant site-prep and schedule hurdles are cleared. The combination of allowable CU uses, the 10k SF pad, and the pre-integrated drainage asset allows a developer to significantly compress the traditional "site-prep" window. Capture the epicenter of growth, anchored by the FY2027 Oil Well Road expansion and $438M regional utility extensions.
————————————————
DATA ROOM DOCUMENTS
————————————————
Detailed infrastructure analysis, ERP permit data, and site-specific pro-forma insights are available to qualified buyers upon the execution of a Confidentiality Agreement. Targeted infrastructure flyers for Medical, ALF, and Educational uses are available to registered users in the Virtual Data Room.
————————————————
*Disclaimer: This is an owner-direct, principal-to-principal listing. Property features a pre-existing building pad and lake; Seller makes no representations regarding soil compaction, engineering specifications, or subgrade stability. While dimensions and allowable Conditional Uses (CU) are based on Collier County data, all information, including 2026 Restudy projections and proforma yields, is provided for illustrative purposes only. No entitlements are currently in place. Potential buyers must perform independent due diligence to verify exact usable acreage, infrastructure capacities, and the specific administrative requirements for Conditional Use approval.
————————————————
Serious inquiries are invited to submit a Letter of Intent (LOI) or formal offer directly to Heather Hunter at deanestates23@gmail.com.